#107 House Construction Process

 House construction process from bottom to top



Following are the Steps Involved in Building Construction Process from Start to Finish Pdf:

I) Pre-Construction Steps

  1. To Acquire Land or Plot.
  2. To Seek Technical Help.
  3. Prepare Estimation and Budgets.
  4. Permission from Authorities.
  5. Approach a Builder.
  6. Superstructure – Column.

II) During Building Construction Steps

  1. Site Preparation or Levelling work.
  2. Excavation and PPC.
  3. Foundation.
  4. Plinth Beam or Slab.
  5. Superstructure – Column
  6. Brick Masonry Work.
  7. The Lintel Over Door Window Gaps.
  8. Floor Slab or Roof Structure.
  9. Door Window Framing and Fixations.
  10. Electrical and Plumbing.
  11. Exterior Finishing.
  12. Terrace and Roof Finishing.
  13. Internal Finishes.
  14. Woodwork and Fixture Fittings.

Steps of House Construction Activity in India

  1. Purchasing of Site
    1. Document verification
  2. Building Design - House plan, structure details, estimation of the building and front elevation design
  3. Government Approval
  4. Site Leveling 
  5. Bore well
  6. Consult Contractors
    1. Building Construction contractor
    2. Earthwork contractor
    3. Wooden carpentry work contractor
    4. Electrical contractor
    5. Plumbing contractor
    6. Tails fixing contractor
    7. Granite laying contractor
    8. Painting contractor
    9. Gas pipeline laying contractor
  7. Temporary Shed construction
  8. Site marking
  9. Earthwork
    1. Site leveling
    2. Foundation, sump, and pillars area digging
  10. Sump construction
    1. Drinking water sump
    2. Rainwater harvesting sump
  11. A Temporary power supply arrangement
  12. Bar bending work
  13. Water curing
  14. Foundation construction
  15. Piller footing
  16. Filling cement concrete up to plinth level
  17. Stone foundation as per design
  18. Plinth beam
  19. Red soil filling to plinth area
  20. Piller raising to 7 feet
  21. All Doors frame fixing and leveling
  22. Wall construction up to 3 feet
  23. Window frame fixing
  24. Setup lintel and sajja to window and door level
  25. Raise pillers 10 feet above the plinth level
  26. Raise walls 10 feet above the plinth level
  27. Centering for beam and also roof
  28. Consult for an electrical contractor for provision of roof pipes
  29. Fix centering plates on the water level
  30. Cover all the gaps between the plates
  31. Apply oil to the plates and spread mat over the area
  32. Bar bending work for beams and roofs
  33. Electrical pipes run inside the roofs and beams before molding
  34. Molding and Steps construction
  35. After 12 Hours of molding
  36. After 21 days, remove centering materials
  37. Construct safety grill/Safety Rcc wall around the terrace
  38. Check electric pipes blockage in the RCC
  39. Electrical, Dish line, and Internet marking
  40. Incommer supply box fixing
  41. Electrical pipeline laying inside the house
  42. Plumbing work for the kitchen, bathroom, and wherever required
  43. Laying of water pipes and sewage pipes till the outside wall
  44. Setup Western/Indian toilet to the bathroom
  45. Close all water pipes and sewage pipes with end caps inside and outside
  46. Gas pipeline laying inside and outside wall
  47. Fix kitchen Platform, sink, and Shelves in the kitchen room
  48. Start inside wall and roof plastering
  49. Wherever tails fixing Inside or Outside walls, provide rough plastering
  50. Painting
    1. Birla white cement as to plaster for smooth finishing – 2 coats
    2. One coat of primer paint inside the wall
    3. Final coat painting
  51. Wall tails fixing
  52. Floor tails or Granite laying
  53. Outside wall plastering
  54. Outside plumbing work and tank fixing
  55. Outside one coat primer and one coat painting
  56. Inside and Outside plumbing material fixing
  57. Electrical switch box cover fixing and wiring
  58. Electrical accessories fixing inside the building
  59. Laying of an electrical service line for Permanent connection
  60. Digging of Electrical Earthing Pit
  61. Digging of Toilet/Septic Pit
  62. Swege line connection to drainage
  63. Parking tails fixing
  64. Compound wall construction around the building
  65. Main gate
  66. Front elevation

Above is all the house construction activity we did while constructing our house. There could be a few extra or fewer steps involved depending on your requirements.