1.
Arrangements
for regular performance meetings and performance reviews have been
established.
|
|
2.
The
contractor has provided evidence of registration with TasBuild (refer to the Construction Industry (Long Service) Act
1997).
|
|
3.
A
copy of the project manager’s start-up checklist has been obtained.
|
|
4.
All
relevant local council approvals (eg building permit) have been obtained and
checked by the building surveyor prior to commencing the works.
|
|
5.
Any
variations to the scope of works have been formerly documented and costed.
|
|
6.
The
contractor clearly understands that only the superintendent is authorised to provide
instructions to the contractor.
|
|
7.
Arrangements
are in place to ensure site meetings will be conducted and actions minuted
and filed appropriately where required.
|
|
8.
Work
Health and Safety plans are in place, where applicable and as required by the
Work Health and Safety Act 2012.
9.
Arrangements
are in place to ensure that applicable
work health and safety plans will be followed and other Work Health
and Safety Act requirements will be met (appropriate questions are being
asked at site meetings).
|
|
10.
Arrangements
are in place to ensure ongoing site management of works including
coordination of access, goods lift, work health and safety issues, security,
site cleaning, noise and disruptions will be undertaken.
|
|
11.
Arrangements
are in place to ensure that consultants will be undertaking regular
inspections during the construction phase.
|
|
12.
Arrangements
are in place to ensure progress payments will be made within designated
timeframes.
|
|
13.
A
special clean has been programmed at the completion of the construction
phase.
|
|
14.
Relevant
communications and other wiring certificates have been obtained.
|
|
15.
A
defects inspection has been undertaken prior to handover.
|
|
POST CONSTRUCTION PHASE
16.
A
list of defect items has been identified.
|
|
17.
Timing
of the defects works has been programmed.
|
|
18.
Certificate
of Occupancy has been obtained.
|
|
19.
Security
access cards and keys have been retrieved from contractors.
|
|
20.
Fire
service final certificates have been obtained for:
|
|
·
sprinklers/hydrants;
|
|
·
EWIS
(emergency warning intercommunication system); and
|
|
·
exit/emergency
lights.
|
|
21.
Mechanical
services certificates and air balance records have been obtained.
|
|
22.
Electrical
safety certificate has been obtained.
|
|
23.
Hydraulic
services certificate has been obtained.
|
|
24.
Electrical/data
switchboard documentation and plans have been updated.
|
|
25.
“As installed” drawings have been
obtained and a copy provided to the owner.
|
|
These include:
|
|
·
architectural;
|
|
·
electrical;
|
|
·
mechanical;
|
|
·
plumbing;
and
|
|
·
lighting.
|
|
26.
Statutory
maintenance contracts have been amended to include items identified in the
Form 46 maintenance schedule and at the end of the defects liability period.
|
|
27.
Other
contracts and registers have been amended.
|
|
These include:
|
|
·
security;
|
|
·
cleaning;
|
|
·
key
registers; and
|
|
·
statutory
maintenance.
|
|
28.
Any
redundant items have been removed from an existing maintenance contract.
|
|
29.
Special
cleaning requirements have been programmed.
|
|
30.
Half
of the security/retention moneys has been released upon issue of the
Certificate of Practical Completion.
|
|
31.
For
works contracts $250 000 or greater, the contractor performance reports have been
completed and forwarded to Treasury.
|
|
32.
For
consultancies greater than $10 000, the consultant performance reports have been
completed and forwarded to Treasury.
|
|
POST DEFECTS PERIOD
33.
The
remaining amount of security/retention moneys has been released at the end of
the defects period.
|
|
34.
All
building maintenance contracts have been amended and updated where necessary
post the defects liability period.
|
|